Nothing Found
Sorry, no posts matched your criteria
Downtown Royal Oak Main Art Theatre’s Days May Be Numbered
/in SE Michigan /by Tracy WillisThe 80-year-old Main Art Theatre in downtown Royal Oak could soon be demolished. An A.F. Jonna Development LLC affiliate has submitted plans to tear down the theater and replace it with a 5-story mixed-use building. The developer will appear before the Planning Commission on April 12 to present plans for a new 71-foot building that would include 9,200 square feet of commercial space. A restaurant and a retailer would split the space. The 2nd floor would accommodate 31,000 square feet of office space. The third through fifth floors would include 54 new residential units.
Utility Companies Seek Land For Solar Farms
/in Grand Rapids, Northern Michigan, SE Michigan, Uncategorized, Western Michigan /by Tracy WillisMichigan utility companies are securing real estate to expand their solar energy generation capabilities as consumer demand accelerates. DTE Energy Co. needs 20,000 to 35,000 acres of southern-facing flat land to erect solar arrays over the next 10-15 years. Consumers Energy Co. currently generates 40 megawatts of electricity from solar and plans to be at 8,000 megawatts by 2040. That will require between 40,000-56,000 acres of land. Customer demand and land usage is a balancing act that Lansing policymakers haven’t yet addressed. Industry leaders anticipate some community resistance.
The Mall at Partridge Creek Faces Receivership Sale
/in SE Michigan /by Tracy WillisNothing Found
Sorry, no posts matched your criteria
Nothing Found
Sorry, no posts matched your criteria
Nothing Found
Sorry, no posts matched your criteria
Nothing Found
Sorry, no posts matched your criteria
Long-Term Solutions Address Needs of Detroit’s Homeless
/in Detroit, National /by Tracy WillisThe Pope Francis Center broke ground on a Bridge Housing Campus that will provide 40 studio apartments as temporary shelter to people for 90-120 days. During that time, the project will offer social and job-preparation services and comprehensive medical care that addresses physical, psychological and addiction needs. The project is part of a long-term plan to solve the root causes of chronic homelessness in Detroit by 2030. People who stay in the studio apartments will transition to permanent supportive housing. The facility is scheduled to open mid-2023. Construction will begin in early 2022. Mayor Duggan sees this project as a potential national model.
Asphalt Facility Proposed for Detroit’s Former Farmer Jack Headquarters
/in Detroit /by Tracy WillisThe old Farmer Jack Headquarters in northwest Detroit may soon be the new home of an asphalt mixing facility. The Pontiac-based company, Asphalt Specialists, is proposing the $1.5 million plant. The company currently employees more than 100 employees, including truck drivers and maintenance. The plant would add 40-50 jobs. The plant would include an office and scale house for measuring 3,000-4,000 square feet of product. A dust collection system would collect 98-99% of the odors.
Corktown Apartment Tenants Have Water and Heat Restored
/in Detroit /by Tracy WillisTenants of Corktown’s Victor Attar Court apartments have had their water and heat restored over the weekend. They were previously told they would have to relocate because of health and safety concerns. The building’s owner received 22 tickets amounting to $13,142, according to the city’s Buildings, Safety, Engineering and Environmental Department. The apartment residents were notified last week that if the landlord did not restore heat and water and bring the building up to code, they would have to vacate the building. Real Estate developer Emre Uralli is listed as the trustee of 1324 Porter Street Trust, the entity that bought the property when it was in foreclosure. Uralli claims he was unaware of the heating issues and the tickets. They’ve since met with inspectors and cooperating with them.