Switch Expands Former Steelcase Pyramid Site

The former Steelcase Pyramid site south of Grand Rapids is facing a major expansion. Switch, the Las Vegas-based data storage company, is excavating at the Steelcase Pyramid campus in Gaines Township.  It’s building a 312,000-square-foot building separate from the Pyramid.  The project includes a 1,000-square-foot pump house.  Work on the expansion site began in the spring, with the concrete foundations expected to be poured before the snow flies. The cost of the project, its contractor and completion date have yet to be disclosed. According to Switch’s second-quarter earnings report, it allocated $800,000 toward site preparation.